Pressure Switches

Switches that confirm a lubrication line reached its working pressure during a cycle, or that it vented properly afterwards. In a single-line system this is the primary evidence that the injectors were actually charged. SES holds the range as an authorised SKF distributor, covering pressure ranges Low ranges for oil, high ranges for grease systems; switching Rising or falling edge, with adjustable differential; contacts Volt-free changeover, DC and AC rated; connection Standard threaded ports into blocks and line ends. Executions include fixed setting pressure switches, adjustable pressure switches, high-pressure grease line switches, vent confirmation switches for single-line systems. It is specified most often into single-line grease systems on presses and machine tools and dual-line systems confirming changeover at the line end. Every part is genuine SKF through official channels, with designation, specification and options confirmed against your duty before it ships — supplied from Kolkata and our branch network, with breakdown cover that does not sit in an inbox.

Send an enquiry

Check Price & Availability.

Give us the size or the failed part — we reply on WhatsApp.

Opens WhatsApp with your details pre-filled — we reply with price, stock and lead time.

Trusted across Metals & Energy

Supplying India’s Industrial Names.

From integrated steel plants to power utilities and EPC majors — the works that cannot afford a counterfeit part specify through SES.

Tata Steel
SAIL — Steel Authority of India
JSW Steel
Jindal Steel & Power
AM/NS India
Vedanta
ONGC
Oil India
Indian Oil
NTPC
DVC — Damodar Valley Corporation
Tata Steel
SAIL — Steel Authority of India
JSW Steel
Jindal Steel & Power
AM/NS India
Vedanta
ONGC
Oil India
Indian Oil
NTPC
DVC — Damodar Valley Corporation
WBSEDCL
Maharashtra State Electricity Board
CSPDCL
UPRVUNL
Indian Railways
Primetals Technologies
Danieli
SMS Group
SMS Meer
Yogiji Digi
WBSEDCL
Maharashtra State Electricity Board
CSPDCL
UPRVUNL
Indian Railways
Primetals Technologies
Danieli
SMS Group
SMS Meer
Yogiji Digi
  • Confirms

    Line reached set pressure, or vented

  • Action

    Ends the cycle or raises a fault

  • Placement

    Far end of the line

  • Setting

    Below relief, above worst-case cold loss

Where it runs.

You will find Pressure Switches in the parts of a plant where this particular duty actually occurs. In practice that means single-line grease systems on presses and machine tools, dual-line systems confirming changeover at the line end, conveyor lubrication circuits with long feed runs, and equally central grease rooms feeding several machine circuits, oil circulating systems confirming supply pressure. What links them is the duty rather than the machine name — confirms: Line reached set pressure, or vented. If your installation is not on that list it matters less than you would think: the operating condition decides the specification. Send us the load, the speed, the running temperature and the environment it runs in, and we will match it to the right execution in the SKF range and confirm what is in stock.

Specify it against the duty.

Specification here follows the operating condition, not the catalogue. Nuisance trips on the first cycle of a cold morning — A wider switching differential and a longer cycle timeout. Cold grease produces a pressure spike and a slow vent, and a narrow band will report a fault on a system that is working correctly. Switch currently mounted on the pump manifold — Relocation to the far end of the longest branch. A switch at the pump confirms only that the pump built pressure against its own outlet, which it will do even with the line severed downstream. System that must confirm the line vented between cycles — A falling-edge switch or a vent-confirmation input at the controller. Injectors that have not vented cannot recharge, so the next cycle delivers nothing at all. Where two of those apply at once, specify for the harsher of the two — under-specifying is what puts the part back on the bench a month later. Send us the duty and we will confirm the execution.

Ordering this from SES.

Write the set point and the date on a tag at the switch itself. On a system with several branches, a switch reset by a fitter and never recorded is the reason nobody can explain why one branch has been under-dosed since the last shutdown.